New & Planned Local Roadworks 1/2 August

M25
01 August — 02 August
Delays likely Road closure
Works location: Entry Slip Road Closure, Anti-Clockwise.
Works description: M25 Jct 29 Anti-Clockwise Entry Slip Carriageway Closure, Anti-Clockwise for barrier repairs Diversion via HE network
Responsibility for works: Highways England
Current status: Planned work about to start
Works reference: 66820

Wingletye Lane, Hornchurch, Havering
02 August — 10 August
Delays likely Traffic control (two-way signals)
Works location: Unknown
Works description: LAY NEW DUCT IN FOOTWAY
Responsibility for works: VIRGIN MEDIA
Current status: Planned work about to start
Works reference: NK100/SCLJBU/96264/LBAU

M25
01 August — 02 August
Delays possibleLane closure
Works location: Hard Shoulder, Lane 1 Closure, Anti-Clockwise. Left Hard Shoulder Closed.Left Permanent Lane 1 Closed.
Works description: M25 Jct 30 to Jct 29 Lane Closure, Anti-Clockwise for barrier repairs
Responsibility for works: Highways England
Current status: Planned work about to start
Works reference: 66649

M25
01 August — 02 August
Delays possibleLane closure
Works location: Lanes 1 and 2 Closure, Anti-Clockwise. Left Hard Shoulder Closed.Left Permanent Lane 1 Closed.Left Permanent Lane 2 Closed.
Works description: M25 Jct 29 to Jct 28 Lane Closure, Anti-Clockwise for barrier repairs
Responsibility for works: Highways England
Current status: Planned work about to start
Works reference: 66809

Champion Road, Upminster, Havering
01 August — 04 August
Delays unlikelyTraffic control (give & take)
Works location: Unknown
Works description: REMEDIAL WORKS TO RECTFIY DEFECT IN FOOTWAY/CARRIAGEWAY
Responsibility for works: ESSEX AND SUFFOLK WATER
Current status: Planned work about to start
Works reference: EN0143103237

Somerset Gardens, Hornchurch, Havering
02 August — 07 August
Delays unlikely No carriageway incursion
Works location: Unknown
Works description: Connections Small Service:Installation of a new electricity supply for a customer:JOINT HOLE IN FOOTWAY TO DE-LOOP SUPPLY AND PROVIDE A NEW SERVICE – Footway closure with pedestrians to use safe alternative crossing points and UKPN to park on road as no restrictions
Responsibility for works: UK POWER NETWORKS EASTERN & LONDON
Current status: Planned work about to start
Works reference: EC30034798448

Leave a Reply

This site uses Akismet to reduce spam. Learn how your comment data is processed.

News Archives

Enjoy our site? Please spread the word.

RSS
Follow by Email
Facebook
Google+
https://www.ucra.co.uk/new-planned-local-roadworks-1-2-august">
Twitter