New & Planned Local Roadworks 10/11 Jan

A124 St Marys Lane, Upminster, Havering

10 January — 15 January
Delays likely Traffic control (two-way signals)
Works location: Unknown
Works description: 1 x 50mm metered connection in footway & carriageway
Responsibility for works: ESSEX AND SUFFOLK WATER
Current status: Planned work about to start
Works reference: EN0143043074

B1421 Corbets Tey Road, Upminster, Havering
12 January — 13 January
Delays likely Traffic control (two-way signals)
Works location: Unknown
Works description: Remedial Works Following Defect Inspection- To rectify remedial work in Carriageway
Responsibility for works: Cadent
Current status: Planned work about to start
Works reference: AZ0071000784924

M25
10 January — 11 January
Delays likelyRoad closure
Works location: Entry slip road closure anticlockwise.
Works description: M25 Jct 29 Entry slip road closure anticlockwise for sign repairs. Diversion via Highways England network.
Responsibility for works: Highways England
Current status: Planned work about to start
Works reference: 62751

M25
10 January — 11 January
Delays possibleLane closure
Works location: Lane 1,2 closure anticlockwise. Left Permanent Lane 1 Closed.Left Permanent Lane 2 Closed.
Works description: M25 Jct 29 to Jct 28 Lane closures anticlockwise for sign repairs.
Responsibility for works: Highways England
Current status: Planned work about to start
Works reference: 62764

Benets Road, Hornchurch, Havering
11 January — 15 January
Delays unlikelyTraffic control (give & take)
Works location: Unknown
Works description: Lay one new service connection in carriageway,footway and reinstate
Responsibility for works: ESSEX AND SUFFOLK WATER
Current status: Planned work about to start
Works reference: EN0143187841

Eversleigh Gardens, Upminster, Havering
10 January — 12 January
Delays unlikelyTraffic control (give & take)
Works location: Unknown
Works description: TO RENEW COMMUNICATION PIPE IN TARMAC FOOTWAY AND REINSTATE
Responsibility for works: ESSEX AND SUFFOLK WATER
Current status: Planned work about to start
Works reference: EN0143202587

Hall Lane, Upminster, Havering
10 January — 11 January
Delays unlikelyNo carriageway incursion
Works location: Unknown
Works description: UNBLOCK TEE IN FOOTWAY FOR CUSTOMER CONNECTION
Responsibility for works: VIRGIN MEDIA
Current status: Planned work about to start
Works reference: NK100/NEMTRE/NL/718609/1

Queens Gardens, Upminster, Havering
10 January — 14 January
Delays unlikelySome carriageway incursion
Works location: Unknown
Works description: Lay one new service in driveway, footway and reinstate
Responsibility for works: ESSEX AND SUFFOLK WATER
Current status: Planned work about to start
Works reference: EN0143225815

Wingletye Lane, Hornchurch, Havering
11 January — 15 January
Delays unlikelyNo carriageway incursion
Works location: Unknown
Works description: Ground level works on cabinet. Day 1 Nokia to attend to remove all equipment to allow Commscope to complete retrofit. Day 2 Nokia to install all new internal cabinet kit. Day 3 Integration of all new tech, tagging and testing
Responsibility for works: O2 (UK) Limited
Current status: Planned work about to start
Works reference: MG080GBC-44408

Leave a Reply

This site uses Akismet to reduce spam. Learn how your comment data is processed.