New & Planned Local Roadworks 18/19 Sept

A127 Southend Arterial Road, Hornchurch, Havering
18 September — 20 September
Delays likely Lane closure
Works location: Unknown
Works description: DRAINAGE SURVEY& CORING Lane 1
Responsibility for works: Transport for London
Current status: Planned work about to start
Works reference: YG423392749

A127 Southend Arterial Road, Hornchurch, Havering
19 September — 22 September
Delays likely Lane closure
Works location: Unknown
Works description: DRAINAGE SURVEY& CORING Lane 2
Responsibility for works: Transport for London
Current status: Planned work about to start
Works reference: YG423392752

M25
18 September — 19 September
Delays likely Road closure
Works location: Anti-clockwise, Entry slip closure.
Works description: M25, Jct 29 Anti-clockwise entry slip, Carriageway closure for electrical works. Diversion via HE network.
Responsibility for works: Highways England
Current status: Planned work about to start
Works reference: 70235

B1421 Corbets Tey Road, Upminster, Havering
19 September — 21 September
Delays possible Some carriageway incursion
Works location: Unknown
Works description: UPMINSTER 544204 – INTERIM TO PERMANENT – in cw
Responsibility for works: Openreach
Current status: Planned work about to start
Works reference: BC006MU1WBAUNWIBULJ0VR01

B186 Clay Tye Road, Upminster, Havering
18 September — 19 September
Delays possible Traffic control (two-way signals)
Works location: Unknown
Works description: Access required to provide a new Pole in verge for new customer service,
Responsibility for works: Openreach
Current status: Planned work about to start
Works reference: BC005CA789W000IBUW2RDW01

M25
19 September — 20 September
Delays possible Lane closure
Works location: Lanes 2,3,4 closure, Jct 30 to Jct 29. Left Permanent Lane 2 Closed.Left Permanent Lane 3 Closed.Left Permanent Lane 4 Closed.
Works description: M25, Jct 30 to Jct 29, Anti-clockwise lane closures for repair of signals.
Responsibility for works: Highways England
Current status: Planned work about to start
Works reference: 43275

Hill Rise, Upminster, Havering
19 September — 22 September
Delays unlikely Some carriageway incursion
Works location: Unknown
Works description: PERM REINSTATE FOOTWAY
Responsibility for works: ESSEX AND SUFFOLK WATER
Current status: Planned work about to start
Works reference: EN0143019214

Leave a Reply

This site uses Akismet to reduce spam. Learn how your comment data is processed.

News Archives

Enjoy our site? Please spread the word.

RSS
Follow by Email
Facebook
Google+
https://www.ucra.co.uk/new-planned-local-roadworks-18-19-sept">
Twitter