New & Planned Local Roadworks 30 Sept/1 Oct

Front Lane, Upminster, Havering
01 October — 06 October
Delays likelyTraffic control (two-way signals)
Works location: Unknown
Works description: Connections Highway Services:Disconnection / reconnection of existing electricity supply for a customer:Transfer of electricity Supply from old column to new column
Responsibility for works: Havering
Current status: Planned work about to start
Works reference: FK01470010696

Wingletye Lane, Hornchurch, Havering
30 September — 01 October
Delays likely Traffic control (two-way signals)
Works location: Bridge (Road Over Rail) Named – WINGLE TYE LANE ROU No: 3, From 53 metres North/East the junction of…
Works description: Vegetation Clearance working from 09.00-15.00…
Responsibility for works: Network Rail
Current status: Advanced planning
Works reference: KL733ROU-02-41-300918

Wingletye Lane, Hornchurch, Havering
30 September — 01 October
Delays likely Traffic control (two-way signals)
Works location: Maywin Drive to 158
Works description: Vegetation Clearance working from 09.00-15.00…
Responsibility for works: Network Rail
Current status: Advanced planning
Works reference: KL733ROU-02-41-300918

B186,B1421 Ockendon Road, Upminster, Havering
01 October — 06 October
Delays possibleTraffic control (two-way signals)
Works location: Unknown
Works description: Connections Highway Services:Disconnection / reconnection of existing electricity supply for a customer:Disconnection of a lamp column from the overhead line
Responsibility for works: Havering
Current status: Planned work about to start
Works reference: FK01470010697

Cranston Park Avenue, Upminster, Havering
01 October — 04 October
Delays unlikelyNo carriageway incursion
Works location: Unknown
Works description: Connections Small Service:Installation of a new electricity supply for a customer:JOINT HOLE IN FOOTWAY AGAINST PROPERTY BOUNDARY – MAINTAIN FOOTWAY SLG – UKPN VEHICLES TO PARK ON CUSTOMER LAND
Responsibility for works: UK POWER NETWORKS EASTERN & LONDON
Current status: Planned work about to start
Works reference: EC30034802608

Leave a Reply

This site uses Akismet to reduce spam. Learn how your comment data is processed.

News Archives

Enjoy our site? Please spread the word.

RSS
Follow by Email
Facebook
Google+
https://www.ucra.co.uk/new-planned-local-roadworks-30-sept-1-oct">
Twitter