Ongoing & New Planned Roadworks from 18 May

Please see separate post for details of road restrictions related to the We Are FSTVL, which is being held between Friday 24 & Sunday 26 May.

Ingrebourne Gardens, Upminster
13 May – 04 June
Delays likely Traffic control (two/three-way signals)
Works location: Various points along road
Works description: Essential gas pipe replacement work
Responsibility for works: Cadent
Current status: Work in progress
Works reference: AZ0071000834940

 

Fen Lane, North Ockendon
13 – 30 May
Delays likely Traffic control (two-way signals)
Works location: Unknown
Works description: Clean gullies & reform ditch
Responsibility for works: London Borough of Havering
Current status: Work in progress
Works reference: FK02000011167

 

Upminster Road, Upminster Bridge
29 April – 02 October
Delays likely Traffic control (two-way signals)
Works location: Unknown
Works description: Essential gas pipe replacement work
Responsibility for works: Cadent
Current status: Advanced planning
Works reference: AZ0071000800321

 

Park Farm Road, Upminster
07 May– 20 May
Delays likely Traffic control (two-way signals)
Works location: Park Farm road
Works description: Works on the pumping station.
Responsibility for works: Thames Water
Current status: About to start
Works reference: MU101WO-PFR/B

Leave a Reply

This site uses Akismet to reduce spam. Learn how your comment data is processed.