Ongoing & New Planned Roadworks from 10 May

Upminster Road, Upminster Bridge
29 April – 02 October
Delays likely Traffic control (two-way signals)
Works location: Unknown
Works description: Essential gas pipe replacement work
Responsibility for works: Cadent
Current status: Advanced planning
Works reference: AZ0071000800321

 

Park Farm Road, Upminster
04 March – 10 May
Delays likely Roadworks
Works location: Whole of Park Farm road
Works description: Repairs to existing bridge and re-construction of carriageway.
Responsibility for works: London Borough of Havering
Current status: Advanced planning
Works reference: FK00200010668

 

Park Farm Road, Upminster
07 May– 20 May
Delays likely Traffic control (two-way signals)
Works location: Park Farm road
Works description: Works on the pumping station.
Responsibility for works: Thames Water
Current status: About to start
Works reference: MU101WO-PFR/B

Leave a Reply

This site uses Akismet to reduce spam. Learn how your comment data is processed.