Draft London Plan and consultation

On July 16 2026, the Draft London Plan 2026 was published. This is the Mayor of London’s strategy for how the city should grow and develop over the next 25 years. It is a lengthy document, and includes policies on housing, jobs, transport, the environment and public spaces.

A consultation has now been opened on the draft plan, which runs from now until 15 October 2026.

For Havering, the draft plan includes a ‘Greenfield housing target’ for the borough of 12,060 homes to be built between 2027-2037 (approximately 1,200 per year). Whilst this does not specifically define this as Green Belt land, it would be difficult to envisage that not being a major part of what is intended.

This figure of 12,060 is 21% of the greenfield target for the whole of London, while other similar boroughs, such as Bexley and Bromley have a zero target.

Locally to us, Upminster has been designated as a ‘Broad location for growth’ (BLG) for both ‘Residential-led mixed use’ and ‘Green Belt Industrial – A127 (Upminster Area)’. The rationale for this appears to be that Upminster has good transport links (particularly rail) compared to other outer London locations.

The news of this proposal will bring dismay to many of our residents, as, if progressed, it could lead to the number of homes in Cranham and Upminster Wards increasing by 30-60% in the next decade.

Local UCRA councillors will be analysing the full contents of the Draft Plan, and responding to the consultation. Members of the public can also view the plan and submit comments by visiting Draft London Plan 2026 and the Draft London Plan Consultation.

 

Leave a Reply

This site uses Akismet to reduce spam. Learn how your comment data is processed.