Latest News

Gallows Corner Update (15th August 2025)

Main Flyover Works Steels have been arriving at the site this week from Germany. Construction of abutments and installation of steelworks has started. Localised foundation works to pile caps continue, to ensure structural integrity. Highway works to the roundabout are ongoing. These include kerb realignments and drainage. Essex

Read more

346 bus route temporary timetable

Thank you to the resident who informed us that Transport for London (TfL) have introduced a temporary timetable for the 346 bus route, with the interval between most buses being 22 minutes, rather than the usual 20. This is apparently due to delays caused by the ongoing

Read more